Achievements Introduction

Consideration of floodplains

Achievement Summary

Categories
Hydraulic Model Experiment
Purpose In designing the retarding basin, we considered the overflow levee shape and overflow levee energy dissipation works that would satisfy the planned diversion volume from the river channel to the retarding basin.
Facilities available Outdoor Experiment Site
period FY 2018 (Heisei 30) - FY 2019 (Reiwa 1)
Client Chubu Regional Development Bureau
Eligible facilities Kumozu River

Experimental Scene

The approximately 6km-long Kumozu River that runs through Mie Prefecture and the proposed retarding basin were reproduced in a 1/80-scale hydraulic experiment model. The amount of water diverted from the river channel to the retarding basin (overflow amount) was measured, and the height and length of the overflow levee that would satisfy the planned amount of water diverted was considered. In addition, the flow velocity and direction of the overflow water in the retarding basin were measured, and the installation range and structure of the energy dissipation works were considered.

Japan's top class facilities and a system that can handle everything from basic experiments to consulting

Please feel free to contact us.
We also provide dispatch services throughout the country.

029-869-1041

(Monday to Friday 9:00 to 17:00)

FAX:81-29-869-0269