Achievements Introduction

Hydraulic model experiment on dams

Achievement Summary

Categories
Hydraulic Model Experiment
Purpose An experiment to examine the facility shape of a run-of-river dam. A run-of-river dam is a type of dam that is built specifically for the purpose of flood control and does not need to store water all the time.
Facilities available Indoor Experiment Building
period 2012 (Heisei 24) - 2015 (Heisei 27)
Client Oita Prefecture
Eligible facilities Tamarai Dam

Experimental Scene

We designed and produced a full-scale model (1/40 scale model), an orifice extraction model (1/25 scale model), and a reservoir extraction model (1/40 scale model), and examined emergency spillways, normal spillways, embankment toe guide sections, energy dissipation works, driftwood countermeasures, etc. The video shows the experiment with the full-scale model.

Japan's top class facilities and a system that can handle everything from basic experiments to consulting

Please feel free to contact us.
We also provide dispatch services throughout the country.

029-869-1041

(Monday to Friday 9:00 to 17:00)

FAX:81-29-869-0269